Variations and Site Request Form

What's the Project Address?

Readable Variation Number!


Choose ONE - the type of service required

Who is paying for the variation? External - Customer is paying; Internal - FSS is paying

Select the quote type

Select the Work type

Manual Handling Required for this variation?

How Long Vertical & How Long Horizontal for this variation?

Scaffolding Works Location for this variation?

Measurement and Configuration of Variation Scaffolding.

Scaffolding Works between walls?

Is Material available onsite?


Description Details
     Option 1: In need of loading bays to land bricks on every deck for 8 lifts but they need to be done 1 lift at a time, 2 ton loading capacity ▼  
     Option 2: 1x2.4x2.4x3 mH loading bays - 2 ton rated. ▼  
     Option 3- 1x2.4x2.4x3.0mH loading bay being topped above the 3mH that is already been built. ▼  



Image Preview




Task Created!
Task Created By April Fabian
Job - FSS6295 - 38-42 East Street, Granville Add Note 2026-09-15 10:43:51AM by April Fabian
Cost Added!
Variation Cost Added By Yousif Yousif
Job - FSS6295 - 38-42 East Street, Granville Add Note 2026-09-16 11:43:23AM by Yousif Yousif
Cost Added!
Variation Cost Added By Yousif Yousif
Job - FSS6295 - 38-42 East Street, Granville Add Note 2026-09-16 11:48:33AM by Yousif Yousif
@April Fabian questions by the builder: Why is the transport too High? Because FSS will have to send a truck 8 times because the loading bay is being topped up 1 deck at a time. Why is the labour in erection is too high? FSS will have to send 2 guys half a day as a minimal charge 8 times. Why is labour in dismantle is too high? FSS will allowed to manually handle the scaffold down at dismantle stage, 8 men are required. Why is engineering too high? Because Urban wants an engineer's certificate for deck and there are 8 decks.
Job - FSS6295 - 38-42 East Street, Granville Add Note 2026-09-16 11:55:09AM by Yousif Yousif
Email Send To Customer!
Send Email To Customer By April Fabian
Job - FSS6295 - 38-42 East Street, Granville Add Note 2026-09-17 09:19:55AM by April Fabian
Cost Added!
Variation Cost Added By Yousif Yousif
Job - FSS6295 - 38-42 East Street, Granville Add Note 2026-09-22 12:54:23PM by Yousif Yousif
Cost Added!
Variation Cost Added By Yousif Yousif
Job - FSS6295 - 38-42 East Street, Granville Add Note 2026-09-22 03:01:13PM by Yousif Yousif

Upload pictures of your request

Drag & drop files here, or browse

Preview

Who is submitting the form?