Variations and Site Request Form

What's the Project Address?

Readable Variation Number!


Choose ONE - the type of service required

Who is paying for the variation? External - Customer is paying; Internal - FSS is paying

Select the quote type

Select the Work type

Manual Handling Required for this variation?

How Long Vertical & How Long Horizontal for this variation?

Scaffolding Works Location for this variation?

Measurement and Configuration of Variation Scaffolding.

Scaffolding Works between walls?

Is Material available onsite?


Description Details
     roof edge protection: roofing modifications will take place, however, the scope has been reduced. The roof area requiring modification is shown in the highlighted area below. The perimeter from SixMaps is 107m. The gear can be landed on the Delivery driveway beside the work area with an exclusion zone set up during erection and dismantling.  







Task Created!
Task Created By April Fabian
Job - FSS6883 - Pymble Ladies College Add Note 2026-03-26 04:21:00PM by April Fabian
Cost Added!
Variation Cost Added By Yousif Yousif
Job - FSS6883 - Pymble Ladies College Add Note 2026-03-27 11:43:20AM by Yousif Yousif
Cost Added!
Variation Cost Added By Yousif Yousif
Job - FSS6883 - Pymble Ladies College Add Note 2026-03-30 03:17:31PM by Yousif Yousif

Upload pictures of your request

Drag & drop files here, or browse

Preview

Who is submitting the form?