Variations and Site Request Form

What's the Project Address?

Readable Variation Number!


Choose ONE - the type of service required

Who is paying for the variation? External - Customer is paying; Internal - FSS is paying

Select the quote type

Select the Work type

Manual Handling Required for this variation?

How Long Vertical & How Long Horizontal for this variation?

Scaffolding Works Location for this variation?

Measurement and Configuration of Variation Scaffolding.

Scaffolding Works between walls?

Is Material available onsite?


Description Details
     scaffold works as per the attached swinging stage marked up plan  Stage 1 Nook – Ground to level 1 scaffold with access ladder. The Swinging stage will land on level 1. Stage 2 Hoist Area – Scaffold on level 8. The Swinging stage ( Roof to level 8)  will stop on level 8 ( approx 2-3m high) . There will need to be access ladder  on level 8 to get to the swinging stage. The scaffold will need to be rated to support the swinging stage and for workers to work on the scaffold below from levels 1 to 8. There is approx 6 weeks hire for both stages ▼
     Component 1:Swinging stage parking bay. 10 KPa scaffold with a ladder access. Parking is 4 mL x 3 mH and it is located between grids BB and BC across grid C1. ▼  
     Component 2.1 : In contract allowances, FSS allowed to infill the hoist area after hoist removal with standard medium duty scaffold. As per the hoist specs, the hoist is 4.8 mL. Therefore, FSS allowed to rebuild 2 medium duty scaffold bays to hoist area after hoist removal. Omaya advised FSS that the top deck of the scaffold that would infill the hoist is to be load rated to act as parking bay for the swing stage. Therefore, extra reinforcement is to be added to the 2 bays that were allowed in the contract to infill the hoist area. The extra to over cost to reinforce the 2 bays are as follow (Please note that the swings stage is marked up to be 9.6 mL which means that FSS will have to charge for another 2 additional load rated bays. The additional 2 load rated bays are to be explained in component 2.2): ▼  
     Component 2.2: Additional 2 bays from GL- L9 to be added to the allowed hoist infill bays to create 9.6 mL swing stage parking bay. 10 KPa rated including all required reinforcement. ▼  
     Component 2.3: Additional 1 x bay-YY: No longer required. ▼  
     Manual Handling due to crane removal for components 2.1,2.2 and 2.3 from the GL to the top. ▼  







Task Created!
Task Created By April Fabian
Job - FSS6113 - 21 Parramatta Rd Homebush Add Note 2026-08-17 03:32:42PM by April Fabian
Cost Added!
Variation Cost Added By Yousif Yousif
Job - FSS6113 - 21 Parramatta Rd Homebush Add Note 2026-08-19 10:59:12AM by Yousif Yousif
Cost Added!
Variation Cost Added By Yousif Yousif
Job - FSS6113 - 21 Parramatta Rd Homebush Add Note 2026-08-19 11:02:29AM by Yousif Yousif
Cost Added!
Variation Cost Added By Yousif Yousif
Job - FSS6113 - 21 Parramatta Rd Homebush Add Note 2026-08-19 11:06:30AM by Yousif Yousif
Cost Added!
Variation Cost Added By Yousif Yousif
Job - FSS6113 - 21 Parramatta Rd Homebush Add Note 2026-08-19 11:12:33AM by Yousif Yousif
Email Send To Customer!
Send Email To Customer By April Fabian
Job - FSS6113 - 21 Parramatta Rd Homebush Add Note 2026-08-19 12:21:12PM by April Fabian
Cost Added!
Variation Cost Added By Yousif Yousif
Job - FSS6113 - 21 Parramatta Rd Homebush Add Note 2026-09-14 04:15:58PM by Yousif Yousif
Cost Added!
Variation Cost Added By Yousif Yousif
Job - FSS6113 - 21 Parramatta Rd Homebush Add Note 2026-09-14 04:24:38PM by Yousif Yousif
Cost Added!
Variation Cost Added By Yousif Yousif
Job - FSS6113 - 21 Parramatta Rd Homebush Add Note 2026-09-14 04:27:04PM by Yousif Yousif
Cost Added!
Variation Cost Added By Yousif Yousif
Job - FSS6113 - 21 Parramatta Rd Homebush Add Note 2026-09-21 02:45:14PM by Yousif Yousif

Upload pictures of your request

Drag & drop files here, or browse

Preview

Who is submitting the form?