Variations and Site Request Form

What's the Project Address?

Readable Variation Number!


Choose ONE - the type of service required

Who is paying for the variation? External - Customer is paying; Internal - FSS is paying

Select the quote type

Select the Work type

Manual Handling Required for this variation?

How Long Vertical & How Long Horizontal for this variation?

Scaffolding Works Location for this variation?

Measurement and Configuration of Variation Scaffolding.

Scaffolding Works between walls?

Is Material available onsite?


Description Details
     amend the scaffold design for the Bourke Street elevation to provide a 3-board scaffold with 1 hop-up along the section running parallel to the four live overhead power lines. The scaffold arrangement is to ensure that the working platform is positioned more than 4 metres clear of the live overhead lines at all times. Also, can you advise if this arrangement can be later amended to accommodate the 5+2 arrangement without having to completely strip the scaffold?



Image Preview




Task Created!
Task Created By April Fabian
Job - FSS7560 - WATERLOO - Danks Street District Add Note 2026-07-22 09:14:26AM by April Fabian

Upload pictures of your request

Drag & drop files here, or browse

Preview

Who is submitting the form?