Updated Successfully.
Update Contact
Contact Information
Description Information
Jobs

Job Name Stage Amount
On Hills Central Rouse Hill -Man & Material Hoist Closed Lost/Other AU$ 0
Open Activities

Open Tasks 0
Open Meetings 0
Open Calls 0

Closed Activities

Closed Tasks 13
Closed Meetings 0
Closed Calls 5

FSS8465.10 - 25-29 Gertrude Street, Wolli Creek Mar 20, 2020
Yousif Yousif
Closed Time: 2020-03-23T11:34:39+05:30
Status: Completed
Estimating Task Type: Variation - Priority 2
Description: Please check these and price it for me, looks like Variation to our Client , but these points were requested by our Subbie for extra work he believes he has done for us. 1. A class hoarding down as a option 4 but only 6.6LM we done 21m $??? + GST ( FIND OUT PRICING ) 2. Extra PLY on LVL 1 for power lines protection 44.8m long x 2.4m high option 1 only has 40LM $??? + GST ( FIND OUT PRICING ) 3. 11 ladder beams - Due to beam through building not on plan $??? + GST ( FIND OUT PRICING ) 4. Stretcher Stair block B, Not on item grid or break down grid but on plans only has alloy stair on item grid $??? + GST ( FIND OUT PRICING ) 5. Build extra bays to premiter scaff where hoist is, bays are not on plan $??? ( FIND OUT PRICING ) 6. Striped stair access for LUNCH ROOM AND TOILET $??? ( FIND OUT PRICING ) Estimating department comments 1. We have allowed 6.6 LM on one building and 14 LM on the other building. In total, we have allowed for 21 LM. Please make sure that we do not pay the subbie twice for the A-class hoarding. 2. The Extra 4m will have to be paid to the subbie after confirming with the site supervisor. 3. This will have to be charged as a variation to the client as it was included in the price. The client to be charged $2300+GST and subbie to receive $825.00+GST 4. Stretcher is included per each building. 5. An accurate measure to be made on site to assess the variation and price accordingly. However, the shop drawing show that there will be no scaffold in front of hoist. 6. This was not included in our quote. please provide more information to assess the variation and price accordingly. Regards Yousif Yousif

FSS8465 - 25-29 Gertrude St, Wolli Creek Mar 23, 2020
Yousif Yousif
Closed Time: 2020-03-23T11:34:18+05:30
Status: Completed
Estimating Task Type: Variation - Priority 2
Description: Hi Kemal, Building B, North and South elevations inside piggy back bays need to be installed due to gap from building edge to scaffold being greater than 225mm Base out has been built as per shop drawings to L3 to at which stage building is at. The concerns are Levels 1,3,5,7 this is where the building steps in. Drawings showed 3 board hops were to be installed in these areas. Doing this has left a 300mm gap. Building piggy back bays will eliminate this. Levels 2,4,6,8 step out. The following is what is to be built. North Elevation, 39mL, 3 board wide South Elevation, 15m L, 3 board wide Piggy bays are to be built at following levels Ground to underside of L2 L2 to underside of L4 L4 to underside of L6 L6 to the underside of L8 Please work at variation price and discuss with myself or Bruce Regards Willie, Comments By Estimating Department: By referring to FSS latest mark up, It does show that we allowed to fill the gaps on the front and rear elevation of building. The quantity of the scaffold required for the piggy was included in the in the initial take off. The issue that occurred on site is a design issue (not estimating issue) and management will have to make decision of whether to pay to Subbi to rectify the defect or not. Regards Yousif Yousif

Book Discovery Meeting May 20, 2022
Theo Bardis
Closed Time: 2024-03-15 02:13:53PM
Status: Completed
Estimating Task Type: None
Description: A builder has been appointed to this project. It's time to book in a discovery meeting!

FSS3471- BINAH May 24, 2022
Yousif Yousif
Closed Time: 2022-05-19T09:59:21+05:30
Status: Completed
Estimating Task Type: Final Reprice - Priority 1


FSS3612 Dec 07, 2023
Jolly Ebong
Closed Time: 2023-12-07T10:55:33+05:30
Status: Completed
Estimating Task Type: Variation - Priority 2
Description: Hi Yousif, Good afternoon. Please provide price for scaffolding required for deep planter to enable the formworker to safely build and strip and carry out waterproofing Jolly, please charge the builder $6,900.00+GST Pay the subbie $1040.00+GSt for erection Pay the subbie $520.00+GST for dismantle. Yousif

FSS3612 Jan 17, 2024
Jolly Ebong
Closed Time: 2024-01-18T04:30:59+05:30
Status: Completed
Estimating Task Type: Variation - Priority 2
Description: Hi Yousif, Please can you price the variation works as requested by Binah We are looking to add 2 sheds with dimensions as per the below: - 3m x 3m - 6m x 3m Allow for Engineering and Modification to B-Class Hoarding Design. Please see Ranji's note: I have visited the site today and confirm it is feasible to accommodate the two sheds but with Engineered modifications to the current support structure. They require two additional sheds to be installed namely a 3x3m shed and a 3m x 6m shed. The 3x3m shed is not an issue as it will go in between the current top sheds. However, the second shed will sit parallel to the front top shed and will load the current cantilevers. Therefore, I have worked out an engineered solution which I need to put some numbers and hand sketch for your quotation to client. Our fee for the design modification and hand sketches is $450- plus gst. Please issue a PO if you would like us to proceed. Regards, . Jolly, Please charge the builder $17,900.00+GST Please pay the subbie $2,600.00+GSt for erection Plase pay the subbie $1,300.00+GST for dismantle. Yousif

FSS3612 Feb 15, 2024
Yousif Yousif
Closed Time: 2024-02-16 09:44:23AM
Status: Completed
Estimating Task Type: Variation - Priority 2
Description: Hi Yousif, Good morning, Binah has requested the supply, installation (Inclusive of Toe boards) and dismantle for 4-5 weeks maximum. Transportation

FSS3612 Mar 14, 2024
Yousif Yousif
Closed Time: 2024-03-15 09:44:52PM
Status: Completed
Estimating Task Type: Variation - Priority 2
Description: Hi Yousif, Attached photo's show scaffold had to be based out on top of ply in void areas. There are 6 voids. Ladder beams to be installed to suspend legs. A total of 16 ladder beams to be installed. Proscaff started yesterday installing ladder beams. Please price thanks Jolly, As mentioned, this is an internal variation. Yousif

FSS3612 Apr 24, 2024
Yousif Yousif
Closed Time: 2024-04-24 03:11:14PM
Status: Completed
Estimating Task Type: Variation - Priority 2
Description: Talal Al-Masri (Zone 2, site manager) has requested the following Building G as attached mark up Build and dismantle in mechanical shaft, B1-roof Dimension 2.4m L x 1.2m W Transport not required

FSS3612: 41 TERRY ROAD, ROUSE HILL Jun 25, 2024
Yousif Yousif
Closed Time: 2024-06-26 12:02:20PM
Status: Completed
Estimating Task Type: Variation - Priority 2
Description: Hi Yousif, Good afternoon. Scaffold requested by Braxton Shamon Building B, driveway ramp, Level 1 for block work 30m L x 6m H x 3 board wide (no hop ups), 2 decks, transport 6T. Do avail me of the pricing as requested by BINAH. Thanks Alhaji BABA

FSS3612: 41 TERRY ROAD, ROUSE HILL Aug 02, 2024
Yousif Yousif
Closed Time: 2024-08-02 11:22:55AM
Status: Completed
Estimating Task Type: Variation - Priority 2
Description: Hi Yousif Scaffold 1 - 19m L x deck height 2 7m x 3 board wide plus 2 board hop up ladder access Scaffold 2 - 13m L x deck height 2 3m x 3 board wide plus 2 board hop up ladder access Plus 3T transport Regards Jolly

FSS3612: 41 TERRY ROAD, ROUSE HILL Aug 06, 2024
Yousif Yousif
Closed Time: 2024-08-07 09:42:14AM
Status: Completed
Estimating Task Type: Variation - Priority 2
Description: Hi Yousif Variation scaffold has been requested by Talal Al-Masri for Building G Ramp 2 Mechanical Shaft As attached drawings show scaffold has been allowed for in contract for Levels 1 to 2 Unless missed in contract scaffold from B1 LG Ground to is variation Dimension of requested scaffold is 6 5m L x 9m H x 2 board wide Blue markup on drawings is section not required I ll leave that to you Yousif how to deduct from variation price Additionally Scaffolds on Building G and F roof are no longer required The price should be used for the Ramp 2 Mechanical Shaft Scaffold

FSS3612: 41 TERRY ROAD, ROUSE HILL Aug 28, 2024
Yousif Yousif
Closed Time: 2024-08-28 03:41:24PM
Status: Completed
Estimating Task Type: Variation - Priority 2
Description: Hi Yousif Scaffold dimensions as follows 8m L x 4 5m H x 3 board plus 2 board hop ups W 3T transport Build - 2 men x 4 hrs Dismantle - 2 men x 2 hrs Hours given are providing gear has been craned to work front Awaiting your response

Outgoing call to Kintu Bhagat
Jun 28, 2022 05:17 AM
Theo Bardis
Contact Name:

Status: Completed
Descriptions: Kintu moved to Auburn job. Nila is now the main C/A cALLED AND GOT VOICEMAIL

Outgoing call to Kintu Bhagat
Jun 21, 2022 06:17 AM
Theo Bardis
Contact Name:

Status: Completed
Descriptions: Called and got in a meeting reply. will call him back

Outgoing call to Kintu Bhagat
May 23, 2022 08:25 AM
Theo Bardis
Contact Name:

Status: Completed
Descriptions: Called and left voicemail

Follow Up
Jul 08, 2019 08:10 AM
Michael Eskaros
Contact Name:

Status: Completed
Descriptions: Wants a site meeting as discussed with Roy. Will send contract shortly just under the pump at the moment. Hoist issue is outstanding. Wednesday site meeting will clarify start date. Looking 3-4 months for scaffold.

Follow Up
Jun 24, 2019 08:54 AM
Michael Eskaros
Contact Name:

Status: Completed
Descriptions: RM confirmed last week a deal has been made for 314,500

Quotes

Action Job Name Subject Quote ref number Quote stage Quote Owner Cteated Time Grand Total GP%

Campaigns